Penmann recently finalised a complex HVAC upgrade at Nutricia’s Liverpool facility, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production standards. The project encompassed the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://www.penmann.co.uk/penmann-completes-precision-hvac-upgrade-for-nutricias-fsi-phases-1-2-in-liverpool/