1

High-Efficiency 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely conclusion of the project. Designed to strengthen ESG targets, the installation improves system dependability while lowering overall energy usage and CO₂ levels. https://bookmarkuse.com/story20536385/high-efficiency-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story