It may differ from twenty m to a hundred m. Nearer intervals are needed if ground level differs abruptly. The cross- sectional line need not be generally be at proper angles to the main line. This process is Preferably suited for street and railway jobs. Radial Line Strategy So, for https://contour-survey-in-banglad17260.dsiblogger.com/65147695/the-definitive-guide-to-contour-survey